|
|
|
When the roof was completed, the boards
for the side walls were put back in place. |
|
The boards are placed vertically for
the side and end walls. |
|
|
|
Workers used the support system seen
here to stand on while they worked. |
|
Here is the end of the bridge with the
scaffolding still in place. |
|
|
|
The completed wooded structure (above)
and the painted structure (below) are shown. |
|
The bridge has been painted in its original
colors. |